A split level kitchen remodel works best when you open the right wall, not the most obvious one, and settle the structure before you choose a single cabinet. In a split level, the kitchen usually sits half a flight from the entry and the living areas, so every change touches stairs, beams, ducts or plumbing stacks. A licensed general contractor who handles design and permits together keeps those decisions in one plan. That is how we approach it at Axenia Construction, a women-owned general contractor in Rockville, MD serving Maryland, DC and Northern Virginia, through our kitchen and bath remodels.
This guide covers what makes split level kitchens different, the layouts and islands that suit them, how to tell whether a wall can come out, what the permit step involves, and how to plan the budget.
TL;DR
- Open the wall between the kitchen and the room on its own level, usually the dining area. The wall beside the stairs is rarely the one that gives you an open plan.
- Check for a load-bearing wall before design is final. Walls perpendicular to the floor joists, or sitting above the main beam below, are almost certainly carrying load.
- A U-shape, an L-shape with a slim island, or a peninsula with a counter-height pass-through are the layouts that fit most split level footprints.
- Structural openings need a permit in most Maryland jurisdictions, and unpermitted work can cause trouble at resale and with insurance.
- Budget a contingency. Split levels built in the 1960s to 1980s often hide older wiring, pipes and framing surprises.
Table of Contents
- What makes a split level kitchen different
- Open the right wall
- Layouts and islands that suit a split level kitchen
- Can the wall come out? A homeowner’s check
- Permits in Maryland, DC and Northern Virginia
- Older-home surprises to plan for
- Planning the budget
- Design ideas that earn their place
- Working with Axenia Construction
- FAQ
- Sources
What makes a split level kitchen different
A split level has staggered floors joined by short flights of stairs. The kitchen typically lands on the middle level, with the living room a few steps down or up and bedrooms on another half level. That arrangement creates three design problems you do not face in a ranch or a two-story colonial.
The stairs limit how far the room can open. A wall that protects a stairwell cannot simply vanish. If it goes, you need a guard, a railing or a redesigned stair, and the cost climbs quickly.
Structure runs through several levels. Loads transfer floor by floor down to the foundation, so a wall that looks like a simple partition may sit above a beam or post one level down. This Old House explains that a wall running perpendicular to the floor joists, or directly above the main carrying beam in the basement, is almost certainly load-bearing.
Mixed foundations complicate utilities. The lower level often sits on a slab while the main level sits over a crawl space, which can mean cutting concrete when you reroute plumbing or ducts.
None of this makes a split level a bad candidate for a remodel. It makes the early planning matter more.
Open the right wall
Most homeowners ask about the wall they see first. In a split level that is often the stair wall, because it feels like the barrier between the kitchen and the rest of the house. ArchitectureCourses.org makes the point that the wall which really opens the plan is the quieter one between the kitchen and the room sharing its floor level, usually the dining area. Opening it keeps the stair-protecting wall in place, so you avoid a new guard and exposed stair stringer.
A full opening is not the only option. A counter-height pass-through keeps your base cabinets and needs a smaller header, while still giving you light and sightlines between rooms.

When the structure and budget allow a larger move, the results can be striking. In a Washington, D.C. split level Tudor profiled by aspire design and home, architect Chris Lyon replaced a cramped galley kitchen with an open design. The work used many steel beams to remove load-bearing walls and added new stairs on all levels. A four-step change in level between kitchen and family room became a built-in bench. The priorities were sightlines from the kitchen into the family room and a circular flow through the first floor.
Open concept, with limits that help
If you want a split level open concept kitchen, think in zones. The level change is an asset: it can separate cooking from lounging without a wall. A bench on the step, an island that defines the cooking area, or a ceiling that rises over the dining table all let one room read as several.
In a feature on a split-level house, the Boston Globe described a designer who removed a peninsula and a bump-out. The kitchen grew by 7 feet, from about 145 square feet to a 240-square-foot kitchen and dining space, anchored by a center island with a waterfall countertop and three stools. The designer kept the island under a 7.5-foot ceiling to light it well, while the ceiling rises a full story over the dining table.
Layouts and islands that suit a split level kitchen
Split level kitchens tend to be compact and often have a stairwell or entry on one side. These layouts work with that footprint:
- U-shape with one open side. Sink, range and refrigerator form a natural work triangle, and the open side faces the dining area. This is a strong fit for a mid-level kitchen.
- L-shape with a slim island. A narrow rectangular or L-shaped island adds seating and storage without choking the walkway.
- Peninsula with a pass-through. If the structure does not permit a full opening, a peninsula at the old wall line gives you counter space and a view into the next room.
- Galley opened at one end. Where a closed galley sits between a pantry and the dining room, removing the pantry wall often delivers the biggest change.
Islands can hold under-counter storage, pull-out trash and recycling, and a microwave drawer. For a wider look at options, see our guide to kitchen layouts that meet NKBA clearances. NKBA is the National Kitchen & Bath Association, whose guidelines set the clearances designers work to.
Planning numbers worth knowing
The kitchen planning guidelines in Kitchen Planning recommend at least 12 inches of landing area on one side of a cooking surface and 15 inches on the other. They also call for at least 9 inches of counter behind a cooktop on an island or peninsula. Frequently used items should be stored between 15 and 48 inches above the floor. In a small split level kitchen, those numbers decide whether a cooktop can go on the island at all.
Storage when wall space is scarce
Opening a wall removes cabinet runs, so plan to get the storage back. Full-height cabinets on the walls you keep, an appliance garage, deep drawers in the island and a pantry cabinet near the entry all help. The Boston Globe project used abundant upper cabinets wrapping two walls and a painted wood face with an arched opening in place of a costly plaster niche. The result was a distinctive piece of storage built from ordinary materials.
Can the wall come out? A homeowner’s check
This is the question that decides the project. You can gather clues yourself, but a structural decision belongs to an engineer and your local building department.
Clues that a wall is load-bearing:
- It runs perpendicular to the floor joists.
- It sits near the center of the house or under the ridge line.
- It continues through multiple floors.
- It lines up above a beam or posts in the basement or lower level.
- Roof trusses carry tags that call for extra bearing support at that point.
These are the red flags listed by Bridgewater Engineers, and the Weyerhaeuser technical guidance adds that in stick-framed roofs both interior and exterior walls often support roof and ceiling loads. Ceiling joists may also act as collar ties and should not be cut.
Clues that it is not: a wall running parallel to the joists, with nothing stacked above or below it, is more likely a partition. Even so, wiring, ducts and plumbing often hide inside. If you are only dealing with a simple non-structural partition, this guide to removing a partition wall explains how that job differs from a bearing wall.
What happens when a bearing wall goes
The wall’s load has to be redistributed into a replacement beam, down through end posts and into the foundation. According to Miller Consulting Engineers, the engineer determines the beam depth, post and connection sizing, foundation capacity and temporary shoring. The building department then reviews that load path before it issues a permit.

The risks of skipping this are physical. Removing a load-bearing wall without proper support can cause cracks, sticking doors and windows, sagging floors or partial collapse, as This Old House notes. For our own breakdown of the process and the engineer’s role, read our page on load-bearing wall removal.
Permits in Maryland, DC and Northern Virginia
Permit rules differ by jurisdiction, so confirm the details with your county or city. As one example, Montgomery County’s Department of Permitting Services says its restore and repair permit covers cutting away a wall or partition and removing or cutting a structural beam or bearing support. It also covers rearranging parts of a structure and relocating piping or wiring. Homeowners may apply in their own name, though the county strongly suggests that a hired contractor be listed on the permit.
Unpermitted structural work has a long tail. It can lead to penalties and obstacles when you sell, and it may not be covered by insurance. Home inspectors flag it. This matters to realtors and sellers as much as to the owner doing the work. Our Maryland kitchen remodel permits guide walks through county rules and the gas work that often triggers extra review.
Older-home surprises to plan for
Most split levels date from the 1960s to the 1980s. Before you finalize a layout, expect to look into:
- Hazardous materials. A 1970s kitchen can have asbestos-containing materials or lead paint. The U.S. EPA covers lead-safe renovation rules for homes built before 1978, and testing before demolition protects your family and crew.
- Wiring. Older homes may have knob-and-tube or aluminum branch wiring that must be addressed when walls open.
- Plumbing. Galvanized supply lines and cast-iron drains can limit where you move the sink.
- Ducts and vents. A range hood on a new island needs a duct path, and in a split level that path crosses a level change or a ceiling you may be vaulting.
- Ceiling changes. A vaulted ceiling over the kitchen and living area can transform the space, but it changes framing, insulation and lighting plans. The 1970s project documented by Four Generations One Roof removed a load-bearing wall with an engineered beam, took out the old ceiling to vault it, and added an oversized eating island.
That same project shows a lower-cost route. Removing only the half wall facing the living and dining rooms to create an island or peninsula lets in more light without the cost of an engineered beam.
Planning the budget
Three things drive the price of a split level kitchen remodel more than finishes do: whether a bearing wall is involved, how much the utilities move, and what you find behind the walls. A cosmetic update that keeps the footprint is a different project from an open concept conversion with steel.
To set a realistic plan:
- Decide the scope tier first. Refresh, layout change or full open concept. Our kitchen remodel budget planning guide breaks down where the money goes.
- Add structure early. If a wall is bearing, the engineer, beam, posts, permit and finish repairs belong in the first estimate, not as a change order. Our open floor plan cost scenarios show how the budget shifts when walls come out.
- Hold a contingency. Older homes reveal surprises, so keep a reserve for them rather than spending to the last dollar on finishes.
- Think about resale. If you plan to sell, our kitchen remodel ROI guide helps you weigh which upgrades pay back.
- Work from a checklist. Our kitchen remodel checklist for homeowners covers decisions in the order they need to be made.
Design ideas that earn their place
Ideas that recur in good split level kitchens share one feature: they use the level change instead of fighting it.
- A bench on the steps between the kitchen and family room, as in the D.C. Tudor project.
- A center island that anchors both kitchen and dining, sized so aisles stay comfortable.
- A vaulted ceiling over the shared space, with the island kept under a lower plane for task lighting.
- A banquette or desk nook in the footprint you gain from a removed peninsula.
- Continuous flooring across the open area, with the step edge handled by trim or a bench rather than an abrupt change.
- Sightlines to a window or garden when you remove a wall, so the first thing you see from the entry is light.
Our perspective
We see the split level kitchen as a coordination problem before it is a design problem. The stairs, the beam, the ducts and the permit all affect each other, so we would rather settle them in one plan than discover them one at a time.
That is why our design-build approach suits these homes. When design and construction are planned together, the layout you fall in love with is one the structure and the county will actually allow. As a women-owned firm, we put meticulous project management and transparent communication at the center of how we work, and we know that opening up the heart of your home can feel stressful. Our local permitting experience across Maryland, DC and Northern Virginia is part of how we ease that.
Our advice: start with the wall between the kitchen and the room on its own level, get the structural answer early, and let the rest of the design follow.
Arienne
Working with Axenia Construction
We are a licensed, locally owned general contractor in Rockville, MD. For a split level kitchen, our design-build service brings the layout, the structural questions and the build under one roof. Homeowners in Maryland, DC and Virginia can also see how we handle home renovations more broadly.

If you are ready to plan, talk with us through Axenia Construction and tell us about your split level, the wall you are eyeing and what you want the kitchen to do for your household.
FAQ
Can you open up a split level kitchen to the living room?
Often yes, but how far depends on structure and stairs. The easiest opening is usually the wall between the kitchen and the room on the same level. A counter-height pass-through is a smaller step that still adds light and sightlines. A structural check tells you which option is realistic.
Is the wall between my split level kitchen and dining room load-bearing?
It might be. Walls perpendicular to the joists, aligned with a beam below or continuing through floors are likely to bear load. Only an engineer or your building department can confirm it. Plan for a permit if it is.
What layout works best for a small split level kitchen?
A U-shape with one side open to the dining area gives a clear work triangle. An L-shape with a slim island also works well in narrow rooms. Where a full opening is not possible, a peninsula with a pass-through is a practical middle path.
Do I need a permit to remove a kitchen wall in Maryland?
Removing a wall that bears load, or rearranging piping and wiring, generally needs a permit. Requirements vary by county, as Montgomery County’s permitting rules show. Check with your local office or have your contractor confirm the requirements before work starts.
Sources
- Split-Level Kitchen Remodel, ArchitectureCourses.org
- Barrier-Breaking Renovation, aspire design and home
- Kitchen design ideas: Removing peninsula to make more room, Boston Globe
- Kitchen Planning, Wiley excerpt
- How To Identify and Remove a Load-Bearing Wall, This Old House
- Can I Remove This Wall? Bridgewater Engineers
- So, You Want to Remove a Section of Wall in Your House? Weyerhaeuser
- Load-Bearing Wall Removal, Miller Consulting Engineers
- Split Level House Kitchen Remodel, Four Generations One Roof
- Removing a partition wall
- Renovation, Repair and Painting Program, U.S. EPA
