General Contractor Washington, DC

Welcome to Axenia Construction your trusted partner for high-quality kitchen remodeling, bathroom remodeling, and full home renovation services. As a licensed and experienced general contractor serving the Washington, DC metropolitan area, we combine craftsmanship, innovation, and attention to detail to bring your remodeling vision to life.

Whether you are upgrading a historic DC row home, modernizing a condo, or renovating a single-family residence, our team delivers tailored solutions that match the unique style and character of Washington, DC homes.

Additions

REMODELING

Kitchen

REMODELING

Bathroom

REMODELING

Areas We Serve in Washington DC

Axenia Construction provides general contracting, remodeling, design-build, addition, and commercial construction services throughout Washington, DC.

Our service area includes communities and neighborhoods such as Capitol Hill, Georgetown, Dupont Circle, Logan Circle, Shaw, Petworth, Columbia Heights, Brookland, Cleveland Park, Woodley Park, Chevy Chase DC, Northwest Washington, Northeast Washington, Southeast Washington, and surrounding areas throughout the District.

Not sure whether your property is within our service area? Contact our team to discuss your project.

Small Business Enterprise with Women Leadership

At Axenia Construction, we’re proud to be a women-owned and certified small business enterprise. Our commitment to excellence, integrity, and personalized service drives everything we do as we build strong communities and lasting relationships.

ABOUT

AXENIA CONSTRUCTION

REMODELS & ADDITIONS

Homeowners throughout Washington, DC trust Axenia Construction for our experience, reliability, and commitment to excellence. With more than 16 years of industry expertise, we bring a high level of professionalism and craftsmanship to every project. Our client-focused approach ensures clear communication, transparent timelines, and a personalized remodeling experience from start to finish. As a licensed contractor in Washington, DC, we ensure that all work meets regional building standards while maintaining the highest quality of design and construction.

Our design-build process allows homeowners to enjoy a seamless experience, eliminating the stress of coordinating multiple teams. From initial planning and design concepts to material selection and final construction, our team manages every step with precision and care. Whether you are renovating a kitchen, redesigning a bathroom, or remodeling your entire home, Axenia Construction provides dependable solutions that enhance comfort, value, and visual appeal.

General contractor services in Washington, DC

We are proud to serve homeowners across Washington, DC with professionalism, creativity, and high-quality construction services. Contact us today for a free consultation and discover how we can help transform your home with our expert remodeling and design-build solutions.

Kitchen Remodeling in Washington, DC

Upgrade your kitchen with modern, stylish, and functional design solutions tailored to your home.

Home Remodeling in Washington, DC

From single-room upgrades to full home transformations, Axenia Construction provides complete home remodeling services across Bowie, Maryland.

Bathroom Remodeling in Washington, DC

Transform your bathroom into a relaxing, spa-inspired retreat with our professional bathroom remodeling services in Bowie, MD.

SPECIALIZING IN KITCHEN, BATHROOM & HOME ADDITION RENOVATIONS

WE DESIGN, BUILD AND RENOVATE YOUR KITCHEN, BATHROOM AND HOME REMODELING

Renovated multifamily corridor with purple door

Multifamily Hallway Renovation Cost: What to Budget

What a multifamily hallway renovation costs, what drives the price, what a bid should include, and how to compare estimates before you sign a contract.
Office suite being converted into clinic exam rooms

Office to Medical Conversion: Costs, Codes and Steps

Planning an office to medical conversion in Maryland, DC or Virginia? See what to check first, what drives cost, which permits apply and how to sequence the work.
Contractor inspecting a vacant rental apartment

Unit Turn Cost in Maryland: What to Budget in 2026

What a unit turn costs in Maryland: light, standard and heavy scopes, hidden vacancy costs, deposit rules and how to write a scope of work that holds.
Homeowner and builder compare renovation pricing options

Design-Build Pricing Models: Lump Sum, Cost-Plus and GMP

Compare the main design-build pricing models: lump sum, cost-plus with a fee, and guaranteed maximum price. Learn who carries risk and how to choose.
Homeowner and contractor reviewing bathroom permit plans

Rockville Bathroom Permit: When You Need One and What It Costs

Planning a bathroom remodel in Rockville, MD? See when you need a permit, what the city charges, how long review takes, and how inspections work.
Attached deck framing beside an Arlington home

Arlington Deck Permit Rules: What Homeowners Need to Know

Building a deck in Arlington County, VA? Here is when you need a permit, the $355 zoning fee, setback limits, review times and mistakes that stall approval.

Ready to transform your home?

axenia construction

Consult with Us

Axenia Construction’s history of successfully completed projects is the best demonstration of our capabilities. We have a diverse portfolio which showcases our deep expertise and experience.

Let us help you with your remodel or new build!

Frequently Asked Questions

Axenia Construction woman-owned general contractor based in Rockville Maryland

Many Washington, DC remodeling projects require permits. The exact requirements depend on the scope of work.

Projects involving additions, structural alterations, finished basements, new plumbing fixtures, electrical work, HVAC equipment, and many other construction activities may require permits through the DC Department of Buildings or other applicable agencies.

Axenia Construction can help coordinate permitting requirements associated with the construction scope.

For projects where permitting is part of our contracted scope, Axenia Construction can coordinate the construction-related permit process with the owner, design professionals, engineers, subcontractors, and applicable agencies.

Permit and inspection requirements vary by project, so these requirements are reviewed during preconstruction.

Yes. Axenia Construction offers design-build and design-construction coordination for Washington, DC projects.

This approach allows construction considerations such as budget, materials, scheduling, and constructability to be evaluated earlier in the design process.

Yes. Axenia Construction works on renovations involving older and historic-style Washington, DC properties, including row houses.

These projects may require special consideration for masonry construction, party walls, structural modifications, existing building systems, historic features, and site access.

When architectural, engineering, historic, or other professional services are required, we coordinate construction with the appropriate project professionals.

The cost of remodeling a Washington, DC home depends on the size of the property, scope of work, existing conditions, structural modifications, materials, design selections, and mechanical, electrical, and plumbing requirements.

A cosmetic renovation will typically require a very different budget than a complete gut renovation involving structural changes and replacement of major building systems.

Axenia Construction prepares project-specific estimates based on the plans, existing conditions, selections, and construction scope rather than relying solely on a generic cost-per-square-foot number.

Yes. Axenia Construction provides home addition construction in Washington, DC.

Projects can include rear additions, kitchen expansions, additional bedrooms, expanded living areas, and other residential additions.

Additions typically require architectural and structural planning as well as permitting before construction begins.

Some projects do. In particular, DC Department of Buildings requirements can trigger neighbor notification when construction involves work on a property line or party wall.

The requirements depend on the project’s scope and property conditions, so they should be evaluated during design and permitting.

Yes. Axenia Construction provides commercial remodeling and tenant build-out services in Washington, DC.

Projects can include offices, retail spaces, restaurants, professional spaces, interior renovations, tenant improvements, and other commercial construction.


 

Kitchen remodeling costs vary considerably depending on the size of the kitchen, cabinetry, countertops, appliances, finishes, and whether the existing layout will change.

Projects requiring wall removal, structural work, plumbing relocation, electrical upgrades, or extensive custom cabinetry will generally cost more than renovations that maintain the existing configuration.

We recommend establishing the desired scope and finish level before developing a realistic construction budget.